Ground installations
Elegant, durable and powerful
The solar power plant
The FreeVOlt™ solar power plant is the best method to save money by the Client. Thanks to the relatively small financial investment each building owner can provide him/herself with the fully ecologic energy. We use only the best components to build the FreeVolt™ power plants. The offered components have certificates of the renowned certifying units, such as TUV Rheinland, and the production process itself is certified according to the ISO 9001 standards.
Modules
  • Highest quality Polish product
  • Made with the newest available technologies
  • 19.8% efficient modules
  • Certification IEC 61215 & IEC 21730 from TUV Rheinland
  • The production process is certified according to the ISO standards
  • 30 years warranty on the produced electric power
  • 12 years warranty on the module
Inverters
The inverters are characterized by the particularly simple, yet well thought out assembly.The installation of an inverter is performed in a separate assembly of the section with the power modules and the DC/AC connection section. Both sections are connected by the so called Power-Plug which makes the whole operation significantly easy.

The inverter has:
  • An integrated energy management transmitter
  • An integrated data recorder (DATALOGGER)
  • A simple connection to the internet (Wi-Fi, LAN)
  • The most promising in its class
  • Ideal for generating electricity for own use as well as for selling the energy surplus
The assembly systems for the installation of the PV modules – ground
The features of our free-standing constructions:
  • High quality of the aluminum and steel materials
  • A simple and fast assembly of the individual components
  • The possibility of making adjustments in positioning the height and the angle of inclination of the construction 20/25/30 degrees
  • The constructions conform with the European/German requirements and norms
    The construction adapted for the following loads:
  • Snow load – 1.5kN/m2
  • Wind load – 0.48kN/m2
EXPERIENCE
FreeVolt™ is the biggest sales and service network which is confirmed by our certificates and awards.
FINANCING
We also offer a few financing options and indicate possibilities to take advantage of the tax relief before any investment is made.
Implementation map
Case study
Location
Ringgenbach, Niemcy
Power
1.08 MW
Implementation deadline
October 2007
In Germany, over 6200 modules of our technology have been installed within the area of an old wasteland in Ringgenbach. The installation currently supplies energy to 300 houses in Sigmaringen, and it constantly generates 16% more energy than it was foreseen.
Location
Algund, Włochy
Power
917kW
Implementation deadline
Autumn 2008
Tyrol, the northern region of Italy close to the German border, is known for 3 things: apples, wine and tourists. This is where the photovoltaic modules of our technology have been installed on the roof of a great fruit company.
Almost 1MW roof installation provides the building with a clean energy for the cooler, the warehouse and the distribution center.
Location
Mexico City, Meksyk
Power
56kW
Implementation deadline
October 2008
Energy supplies in Mexico can be difficult and expensive. Due to that fact, the international cosmetics tycoon needed an alternative and independent energy source for loading forklift trucks in their warehouse in Mexico City. Due to the increased efficiency and the quality of implementing this task, our technology photovoltaic modules had been selected.
After finishing that work, this project was the biggest in the entire country. The results of it had exceeded all expectations and proved the solar energy potential to be the economical energy source for Mexico.
Location
Portland, USA
Power
860 kW
Implementation deadline
November 2008
Portland Habilitation Center Northwest is the group which is concentrated on education, trainings and rehabilitation of persons with physical and psychological disabilities. As a non-for-profit organization, it seeks savings everywhere which were spotted in the energy costs thanks to the photovoltaic power plant installation on the new 33,500m2 roof.
At the time of finishing the implementation in the fall of 2008, the project was the biggest photovoltaic system installed in the North-West Coast of the United States of America.
Fee electricity in 7 steps
How to become the owner of the solar power plant?
1. Free consultation
2.-6. Documentation and designs
7. Own power plant

Call us

Palm Springs, CA - 760 673 9911
Los Angeles, CA - 818 414 2545
Salt Lake City, UT - 801 410 8941